We would like to inform the public that Raslag Corp. will be conducting a pre-bidding conference via Zoom on August 08, 2024, 10:00am, about the sale of the property, which is beside the well-developed Camella Sorrento Subdivision, and about 2.2 kilometers northwest from North Luzon Expressway Mexico Exit Tollgate. Additionally, it is 8.4 kilometers northwest from Mexico town proper. The property is also accessible from San Fernando City, Pampanga. It is about 7 kilometers northeast from MacArthur Highway corner Brgy. Del Rosario Road.

For the Zoom meeting link, please click here: Pre-Bidding Conference Meeting or you may join by the Zoom Meeting ID: 948 6471 0372 with the Passcode: 521235

Meeting Schedule: August 08, 2024
Meeting Time: 10:00AM

LATEST NEWS

August 2, 2024

Pre-Bidding Conference

We would like to inform the public that Raslag Corp. will be conducting a pre-bidding conference via Zoom on August 08, 2024, 10:00am, about the sale of the property, which is beside the well-developed Camella Sorrento Subdivision, and about 2.2 kilometers northwest from North Luzon Expressway Mexico Exit Tollgate. Additionally, it
July 26, 2024

Invitation to Bid

We would like to inform the public that Raslag Corp. will be conducting a sale of property through Public Auction on an “as-is, where-is” basis. The property is beside the well-developed Camella Sorrento Subdivision, and about 2.2 kilometers northwest from North Luzon Expressway Mexico Exit Tollgate. Additionally, it is 8.4
July 4, 2024

Annual Stockholder’s Meeting for Year 2023 Video Presentation

Derived from the Pampango-word Aslag which means light, RASLAG Corp. is a proud Kapampangan renewable energy developer which boasts on being one of the pioneers of solar energy development in the region. Lighting the future with renewables, we are RASLAG Corp. This is a special video of RASLAG for the
June 26, 2024

NOTICE OF VIRTUAL HEARING

Re: IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO DEVELOP AND OWN DEDICATED POINT-TO-POINT LIMITED FACILITIES TO CONNECT THE RASLAG IV SOLAR POWER PLANT TO THE LUZON GRID, WITH PRAYER FOR PROVISIONAL AUTHORITY – RASLAG CORP. ERC CASE NO. 2024-018 MC     In compliance with the Revised Rules of

 

Stay up to date

Enter your email below to be notified about Openings.

    August 2, 2024

    Pre-Bidding Conference

    We would like to inform the public that Raslag Corp. will be conducting a pre-bidding conference via Zoom on August 08, 2024, 10:00am, about the sale of the property, which is beside the well-developed Camella Sorrento Subdivision, and about 2.2 kilometers northwest from North Luzon Expressway Mexico Exit Tollgate. Additionally, it
    July 26, 2024

    Invitation to Bid

    We would like to inform the public that Raslag Corp. will be conducting a sale of property through Public Auction on an “as-is, where-is” basis. The property is beside the well-developed Camella Sorrento Subdivision, and about 2.2 kilometers northwest from North Luzon Expressway Mexico Exit Tollgate. Additionally, it is 8.4
    July 4, 2024

    Annual Stockholder’s Meeting for Year 2023 Video Presentation

    Derived from the Pampango-word Aslag which means light, RASLAG Corp. is a proud Kapampangan renewable energy developer which boasts on being one of the pioneers of solar energy development in the region. Lighting the future with renewables, we are RASLAG Corp. This is a special video of RASLAG for the
    June 26, 2024

    NOTICE OF VIRTUAL HEARING

    Re: IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO DEVELOP AND OWN DEDICATED POINT-TO-POINT LIMITED FACILITIES TO CONNECT THE RASLAG IV SOLAR POWER PLANT TO THE LUZON GRID, WITH PRAYER FOR PROVISIONAL AUTHORITY – RASLAG CORP. ERC CASE NO. 2024-018 MC     In compliance with the Revised Rules of